Legislation Details

File #: 24-261    Name: Plans & Specs Utility Frame Covers
Type: Report/Consent Status: Agenda Ready
File created: 5/20/2024 In control: City Council
On agenda: 7/3/2024 Final action:
Enactment date: Enactment #:
Title: Approve Plans and Specifications and Authorize Advertisement for Bids for the 2024 Utility Frame Cover Adjustment Project at Various Locations (PW)
Attachments: 1. Attachment 1 - Exhibit A - Map
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA TITLE:
title
Approve Plans and Specifications and Authorize Advertisement for Bids for the 2024 Utility Frame Cover Adjustment Project at Various Locations (PW)
end

MEETING DATE:
July 3, 2024

PREPARED BY:
Public Works Director


recommendation
RECOMMENDED ACTION:
Approve Plans and Specifications and Authorize Advertisement for Bids for the 2024 Utility Frame Cover Adjustment Project at Various Locations.

body
BACKGROUND INFORMATION:
This project consists of adjusting water valves and manhole frames and covers to grade, performing necessary pavement repairs at certain locations throughout the City, and other incidental and related work (collectively the "Project"). The Project details are shown on the plans and specifications.

The Project is necessary because the pavement (after a resurfacing project or due to differential settlement) around utility frames and covers can deteriorate and cause uneven surfaces. This Project will target various locations throughout the City (primarily on high-volume roadways) that were previously resurfaced using a cape seal method, to minimize uneven surfaces and improve ride quality. The targeted high-volume roadways are shown on Exhibit A.

The complete Project plans and specifications are on file in the Public Works Department and will be provided to potential bidders. The planned Project bid opening date is July 18, 2024, and the Project estimate is $300,000.

Staff recommends approving the proposed Project plans and specifications and authorizing the advertisement of bids.

STRATEGIC VISION:
5C. Infrastructure: Address deferred maintenance.

FISCAL IMPACT:
The project will reduce annual maintenance costs and claims associated with the repaired defects.

FUNDING AVAILABLE:
Funding will be identified at the time of award.

_______________________________________
Charles E. Swimley
...

Click here for full text