Legislation Details

File #: 24-373    Name: 2024 PSD & PCL Attestation
Type: Resolution Status: Agenda Ready
File created: 8/26/2024 In control: City Council
On agenda: 9/18/2024 Final action:
Enactment date: Enactment #:
Title: Adopt a Resolution Accepting and Attesting to Veracity of 2023 Lodi Electric Utility Power Source Disclosure and Power Content Label Reports and Authorizing Electric Utility Director to Submit Required Reports to California Energy Commission (EU)
Attachments: 1. Attachment 1 - Exhibit A, 2. Attachment 2 - Exhibit B, 3. Attachment 3 - Resolution
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA TITLE:
title
Adopt a Resolution Accepting and Attesting to Veracity of 2023 Lodi Electric Utility Power Source Disclosure and Power Content Label Reports and Authorizing Electric Utility Director to Submit Required Reports to California Energy Commission (EU)
end

MEETING DATE:
September 18, 2024

PREPARED BY:
Melissa Price, Assistant Electric Utility Director


recommendation
RECOMMENDED ACTION:
Adopt a resolution accepting and attesting to the veracity of the 2023 Lodi Electric Utility Power Source Disclosure and Power Content Label reports and authorizing the Electric Utility Director to submit the required reports to the California Energy Commission.

body
BACKGROUND INFORMATION:
Lodi Electric Utility (LEU) is required to annually disclose the sources of electricity it sells to consumers using reporting formats provided by the California Energy Commission (CEC), per Assembly Bill 162 (Statute of 2009), Senate Bill 1305 (Statute of 1997), Assembly Bill 1110 (Statute of 2016) and Assembly Bill 2227 (Statute of 2012).

As part of this requirement, LEU first submits a Power Source Disclosure (PSD) to the CEC detailing its resource mix for the reporting year as illustrated in Exhibit A. The CEC then compiles power resource information from all load serving entities to issue a resource mix for California. LEU is then required to provide a Power Content Label (PCL) to its customers and the CEC showing the percentage breakdown by resource type as illustrated in Exhibit B. Generation data for both reports is compiled by the Northern California Power Agency (NCPA) and reviewed for accuracy by LEU staff. All reporting activities must be completed by October 1, 2024 and notification to LEU's customers must be completed by December 31, 2024. Customer notification will be done via utility bills, LEU's website, social media, and postings at various City site locations including LEU, City Hall, Carnegie Forum, and the Library.

LEU continues to remai...

Click here for full text