Legislation Details

File #: 25-021    Name: Update Engineering Rules & Regulations
Type: Resolution Status: Agenda Ready
File created: 12/30/2024 In control: City Council
On agenda: 1/15/2025 Final action:
Enactment date: Enactment #:
Title: Adopt a Resolution Authorizing and Adopting Revision 5 to Rule 16 of Lodi Electric Utility Rules and Regulations (EU)
Attachments: 1. Attachment 1 - Rules & Regulations, 2. Attachment 2 - Resolution
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA TITLE:
title
Adopt a Resolution Authorizing and Adopting Revision 5 to Rule 16 of Lodi Electric Utility Rules and Regulations (EU)
end

MEETING DATE:
January 15, 2025

PREPARED BY:
Hasan Shahriar, Engineering & Operations Manager


recommendation
RECOMMENDED ACTION:
Adopt a resolution authorizing and adopting Revision 5 to Rule 16 of the Lodi Electric Utility Rules and Regulations.

body
BACKGROUND INFORMATION:
On March 22, 1989, the City Council approved Resolution 89-29 adopting the Lodi Electric Utility (LEU) Rules and Regulations, attached as Exhibit A, which set forth how the utility will furnish electric service to premises within the LEU service territory.

With continuous changes in the electric utility industry including economic growth, technological advances, and local requirements, periodic revisions to the LEU Rules and Regulations are needed. Staff recommends approval and adoption of Revision 5 to Rule 16 to reflect changes in LEU's invoice processes and address the challenges related to limited capacity for serving new electric loads until the 230 kV Project is completed.

The proposed revisions include an updated note regarding payment of estimated project costs. This change is intended to streamline the current process of issuing cost estimates for new projects. Under the existing process, LEU provides only one estimate of cost after a project's design is complete. However, many of these projects are later abandoned, resulting in uncompensated engineering design time and effort. To address this issue, the proposed process will involve two stages:

* Initial Estimate and Invoice: LEU will collect an engineering design labor estimate upfront, along with an initial invoice to begin the design process.
* Final Invoice: Upon completion of the design, a follow-up invoice will be issued to cover the estimated costs for materials and construction.

This new two-step process aims to minimize the time spent on designing projects tha...