Legislation Details

File #: 25-395    Name: HSS Pool Paintng
Type: Resolution Status: Agenda Ready
File created: 9/8/2025 In control: City Council
On agenda: 11/5/2025 Final action:
Enactment date: Enactment #:
Title: Adopt a Resolution Authorizing City Manager to Execute a Professional Services Agreement with KBI Painting to Repaint the Pool Area at Hutchins Street Square (HSS) ($132,410) and Authorizing City Manager, or Designee to Execute Change Orders ($17,590) for a Total Not to Exceed Amount of $150,000 and Accepting a Donation of $140,000 from the Hutchins Street Square Foundation and Allocate Funds; and Reallocating $10,000 from Hutchins Street Square Pool HVAC Replacement Project Savings. ($150,000) (PRCS)
Attachments: 1. Attachment 1 - Agreement, 2. Attachment 2 - Resolution
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA TITLE:
title
Adopt a Resolution Authorizing City Manager to Execute a Professional Services Agreement with KBI Painting to Repaint the Pool Area at Hutchins Street Square (HSS) ($132,410) and Authorizing City Manager, or Designee to Execute Change Orders ($17,590) for a Total Not to Exceed Amount of $150,000 and Accepting a Donation of $140,000 from the Hutchins Street Square Foundation and Allocate Funds; and Reallocating $10,000 from Hutchins Street Square Pool HVAC Replacement Project Savings. ($150,000) (PRCS)
end

MEETING DATE:
November 5, 2025

PREPARED BY:
Kyle Buchanan, Building Services Supervisor


recommendation
RECOMMENDED ACTION:
Adopt a Resolution Authorizing City Manager to Execute a Professional Services Agreement with KBI Painting to Repaint the Pool Area at Hutchins Street Square (HSS) ($132,410) and Authorizing City Manager, or Designee to Execute Change Orders ($17,590) for a Total Not to Exceed Amount of $150,000 and Accepting a Donation of $140,000 from the Hutchins Street Square Foundation and Allocate Funds; and Reallocating $10,000 from Hutchins Street Square Pool HVAC Replacement Project Savings. ($150,000).

body
BACKGROUND INFORMATION:
In 2023, the City allocated $425,000 for the replacement of the pool HVAC Climate Control System at Hutchins Street Square (HSS). Due to advancements in system programming and the successful repair of the existing unit, the work was completed at a cost of $43,350, far below the original estimate.

As a result of the HVAC Climate Control system being inoperable for an extended period, the pool area experienced significant deterioration due to humidity, including rust, peeling paint, and corrosion to structural and aesthetic components. Staff recommends utilizing $10,000 of the remaining funds to address these conditions through professional repainting of the pool area ("Project") along with accepting a donation from the Hutchins Street Square Foundation in the amount of $140,000 t...