AGENDA TITLE:
title
Accept Improvements Under Contract for 2024 Sidewalk Grinding Program (PW)
end
MEETING DATE:
November 19, 2025
PREPARED BY:
Deputy Public Works Director/City Engineer
recommendation
RECOMMENDED ACTION:
Accept improvements under contract for 2024 Sidewalk Grinding Program.
body
BACKGROUND INFORMATION:
There are approximately 400 miles of sidewalk within the City of Lodi. The State of California Streets and Highways code establishes that it is a property owner's responsibility to maintain the abutting sidewalk in a condition that will not endanger persons or property nor interfere with public use.
On October 5, 2005, Council adopted a Sidewalk Maintenance Policy (Resolution 2005-218) which identifies certain sidewalk defects that will be remedied by the City at no cost to the adjacent property owner. The sidewalk defects remedied by the City primarily include offsets that range between 3/4" to 1 1/2" or minor irregularities. The overarching goals of the policy are to encourage walking and improve safety by reducing the number of defects in the sidewalk, improve the sidewalk system for persons with disabilities, and reduce the City's liability exposure.
This project consists of grinding approximately 9,000 lineal feet of sidewalk offsets (between 1/2" and 1 1/2") at various locations throughout the City to eliminate tripping hazards.
On November 20, 2024 Council awarded the contract to Trip Hazard LLC, of Bay Point, CA in the amount of $97,560.00. The final contract amount was $80,023.70, which is lower than the original contract amount due to multiple locations being pulled from the project scope. The removed locations were considered ineligible for grinding for one of the following reasons: offsets greater than 1 1/2", existing sidewalk was damaged (beyond the ability to grind), or the offset was fixed prior to start of project. All work was completed in substantial conformance with the plans and specification...
Click here for full text