Legislation Details

File #: 24-022    Name: PH W/WW Rates
Type: Resolution Status: Agenda Ready
File created: 12/28/2023 In control: City Council
On agenda: 1/17/2024 Final action:
Enactment date: Enactment #:
Title: Public Hearing to Consider Adopting a Resolution Setting Rate Adjustment of Three Percent (3%) To Water Rates, Effective February 1, 2024 and Four Percent (4%) To Wastewater Rates, Effective July 1, 2024 and Setting Future Water and Wastewater Rate Schedules Pursuant to Proposition 218 for Residential, Commercial and Industrial Customers (PW)
Attachments: 1. Attachment 1 - Exhibit A, 2. Attachment 2 - Exhibit B, 3. Attachment 3 - Exhibit C, 4. Attachment 4 - Exhibit D, 5. Attachment 5 - Exhibit D (Spanish), 6. Attachment 6 - Exhibit E, 7. Attachment 7 - Exhibit F, 8. Attachment 8 - Resolution, 9. Attachment 9 - Exhibit A to the Resolution
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

AGENDA TITLE:                                                                                                                                                                                             

title

Public Hearing to Consider Adopting a Resolution Setting Rate Adjustment of Three Percent (3%) To Water Rates, Effective February 1, 2024 and Four Percent (4%) To Wastewater Rates, Effective July 1, 2024 and Setting Future Water and Wastewater Rate Schedules Pursuant to Proposition 218 for Residential, Commercial and Industrial Customers (PW)

end

 

MEETING DATE:                     

January 17, 2024

 

PREPARED BY:                     

Public Works Director

 

recommendation

RECOMMENDED ACTION:

Public Hearing to Consider Adopting a Resolution Setting Rate Adjustment of Three Percent (3%) To Water Rates, Effective February 1, 2024 and Four Percent (4%) To Wastewater Rates, Effective July 1, 2024, and Setting Future Water and Wastewater Rate Schedules Pursuant to Proposition 218 for Residential, Commercial and Industrial Customers.

 

body

BACKGROUND INFORMATION:

In 2019, the City Council approved a five-year rate program for the City’s water and wastewater utilities. The Council action complied with the Proposition 218 requirements pertaining to such actions. The last pre-approved rate adjustment under the current program for the water utility reflected a 3% increase effective March 1, 2023, which was at the cap of 3%, approved in 2019 and a 3% increase for wastewater utility effective July 1, 2023, which was also at the cap of 3%, also approved in 2019. The Staff recommendation for the maximum annual rate increase of 3 percent was largely driven by the historic inflation rates over the past several years.

 

In the new five-year program, the cap is being requested to be set at 5% in consideration of the recent rise in inflation. A summary of the past rate adjustments is provided in the table in Exhibit A. The purpose of this table is to demonstrate that past rate increases have frequently been below the approved rate cap of 3 percent.

 

Proposed rate schedules and information outlining the financial plan, along with a cost of services study examining the operational costs, water and wastewater treatment, water delivery, wastewater collection, facility replacement/upgrades and many other factors were presented at the September 26, 2023 Shirtsleeve meeting. The public hearing being conducted is to consider adopting the various rate schedules for the period from February 1, 2024 through December 31, 2028. The rate schedules (Exhibit B) set maximum limits (5%) on the various water and wastewater rates for the next five years. It should be emphasized that, each year, the City Council retains authority to approve the actual rates to be implemented.

 

In preparation of the new five-year program, staff engaged the services of Hildebrand Consulting, LLC to conduct an extensive financial plan, cost of services study and current rate structure within both utilities. The final report, Water and Wastewater Rate Study, is provided in Exhibit C.

 

Proposition 218 protest hearing notices, both English and Spanish translations (Exhibit D), were mailed at least 45 days prior to the scheduled public hearing. At the public hearing on January 17, 2024, the City Council will be asked to receive public comment adopt resolution setting rate adjustment of three percent (3%) to water rates, effective February 1, 2024 and four percent (4%) to wastewater rates, effective July 1, 2024 and set future adjustments to water and wastewater rates with limits for the period of January 1, 2025 through December 31, 2028.

 

Staff is recommending a new five-year rate program for water and wastewater that will be subject to the Proposition 218 process. As in the past, rate adjustment forecasts are based upon the financial needs for each utility. Excerpts of the water and wastewater financial models are provided in Exhibits E and F, respectively. These tables reflect the projected revenues vs. expenditures throughout the term of the 5-year rate plan. For both the water and wastewater utilities, the programmed adjustments are not forecasted to less than the five percent per year rate cap.

 

STRATEGIC VISION:

3A. Fiscal Health: Promote City's transparency & fiscal fluency.

 

FISCAL IMPACT:

Increased revenues are required to keep up with cost of service increases and new mandated costs.

 

FUNDING AVAILABLE:

Not applicable.

 

 

                                          _______________________________________

                                                            Charles E. Swimley

                                                            Public Works Director

 

 

                                                           

                                          _______________________________________

                                                            Andrew C. Keys

                                                            Interim City Manager