AGENDA TITLE:
title
Receive Presentation and Update Regarding the Lodi Police Department Training Facility (PD)
end
MEETING DATE:
December 2, 2026
PREPARED BY:
Captain Kevin Kent

recommendation
RECOMMENDED ACTION:
Receive Presentation and Update Regarding the Lodi Police Department Training Facility.
body
BACKGROUND INFORMATION:
The City of Lodi Police Department has a need for a dedicated Training Facility. Currently, Police personnel utilize a small shooting range (“Range”) located in the basement of the City Hall Annex (formerly the Police Facility) which was recently updated. This Range includes five shooting lanes with a maximum target distance of 25 yards and is mostly suitable for pistol shooting.
A dedicated Training Facility is necessary to provide expanded capability for training and certifying staff in the various skills needed for police service on a long-term basis. These skills include long-range shooting (up to 300 yards), bomb disposal, and high-performance driving. Since the existing Range is limited to short-range pistol shooting only, the City of Lodi Police Department must utilize other agencies’ facilities to practice these other skills. The location of the training facility is at White Slough Water Pollution Control Facility.
Development of the Training Facility has been a goal of the City for over 10 years, but due to funding constraints, the City has had to look into phased construction and collaborations with other local agency partners. To this end, the City approached San Joaquin Delta College (“Delta”) about partnering on the development of the Training Facility because both agencies can benefit from the development of the Project. Specifically, the Training Facility will provide one stop public safety training for Delta’s POST Academy students and City public safety staff in the following areas:
• Firearms; and
• Chemical agents training; and
• Emergency Vehicle Operations Course (“EVOC”) training.
The City and Delta currently envision the Training Facility to be developed in three phases. The general scope of each phase is as follows:
• Phase I, The City is currently in the process of building the 300-yard, 10 position range including site and access road improvements.
• Phase 2, Delta would build the EVOC, shade/bleacher area, a classroom accommodating 40 students, fencing/lighting and restrooms.
• Phase 3, Additional shade areas and range expansion.
Council has supported this plan with the following actions:
• April 17, 2019: Authorized a $91,850 professional services agreement with Petralogix Engineering for environmental review and preliminary design of the Lodi Police Department Training Facility at the White Slough Water Pollution Control Facility.
• April 15, 2020: Adopted Resolution No. 2020-75, approving the Final Mitigated Negative Declaration and associated Mitigation Monitoring and Reporting Program for the project.
• October 6, 2021: Adopted Resolution No. 2021-272, authorizing a $347,440 professional services agreement with Petralogix Engineering for final design of the training facility.
• August 6, 2025: Approved the Phase 1 plans and specifications, authorized advertising for bids, and authorized the Acting City Manager to execute a letter of intent with San Joaquin Delta College to partner on the training facility.
• October 15, 2025: Adopted Resolution No. 2025-180, awarding the $768,816.21 Phase 1 construction contract to A.M. Stephens Construction Co., Inc.
Tonight’s action is an update on the project. Additionally, the Acting City Manager did not sign the Letter of Intent in 2025, so the current City Manager will execute the Letter of Intent after this presentation.
FISCAL IMPACT:
Not applicable.
FUNDING AVAILABLE:
Not applicable.