File #: 25-368    Name: CNG Compressor Purchase
Type: Resolution Status: Agenda Ready
File created: 8/25/2025 In control: City Council
On agenda: 10/1/2025 Final action:
Enactment date: Enactment #:
Title: Authorize Advertisement for Bids for Compressed Natural Gas (CNG) Fueling Station Compressor Procurement and Adopt a Resolution Authorizing Acting City Manager or Designee to Award the Contract to Lowest Responsive Bidder ($500,000) (PW)
Attachments: 1. Attachment 1 - Resolution
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

 

AGENDA TITLE:                                                                                                                                                                                             

title

Authorize Advertisement for Bids for Compressed Natural Gas (CNG) Fueling Station Compressor Procurement and Adopt a Resolution Authorizing Acting City Manager or Designee to Award the Contract to Lowest Responsive Bidder ($500,000) (PW)

end

 

MEETING DATE:                     

October 1, 2025

 

PREPARED BY:                     

Public Works Director

 

recommendation

RECOMMENDED ACTION:

Authorize advertisement for bids for Compressed Natural Gas (CNG) Fueling Station Compressor Procurement and adopt a resolution authorizing the Acting City Manager or designee to award the contract to lowest responsive bidder in a total amount not-to-exceed $500,000.

 

body

BACKGROUND INFORMATION:

The City owns and operates 12 buses and 3 heavy duty vehicles that run on CNG. The City constructed a CNG fueling station at the Municipal Service Center (MSC) in 2001/02 so that City vehicles did not need to fuel at a third-party fueling station. A second compressor was added in 2006/07 to provide redundancy and reliability to the system. Since that time, the original compressor has completely shut down, and the second compressor has grown increasingly unreliable.

 

Earlier this year the CNG line that serves the fuel island from the CNG station to the fueling island suffered a major leak rendering the CNG portion of the fuel island inoperable. The City’s CNG maintenance contractor was able to modify the system to safely provide 2 “slow fuel” dispensers close to the CNG station, however that is only a short-term option as it takes extremely long to fuel the busses which has impacted operations.

 

This procurement will request bids for the compressor needed for the improvement project. Staff is recommending that the City procure the new compressor concurrently with the project bid to allow the compressor’s long lead time to overlap with the project’s bidding and contracting timeline. This should allow the project to be completed 2 to 3 months sooner than if the contractor includes it in their bid.

 

The plans and specifications are on file in the Public Works Department. The planned bid opening date is October 22, 2025.

 

Staff recommends authorizing advertisement for bids for the CNG Fueling Station Compressor Procurement and adopting a resolution authorizing the Acting City Manager or designee to award the contract to lowest responsive bidder in a total amount not-to-exceed $500,000.

 

STRATEGIC VISION:

5C. Infrastructure: Address deferred maintenance.

 

FISCAL IMPACT:

The new CNG improvements will improve reliability and reduce maintenance costs.

 

FUNDING AVAILABLE:

Transit Capital PWTR-25002 (60199000.77020) - $500,000.