AGENDA TITLE:                                                                                                                                                                                             

title

Accept Improvements Under Contract for Century DeBenedetti Storm Drain Outfall (PW)

end

 

MEETING DATE:                     

March 20, 2024

 

PREPARED BY:                     

Public Works Director

 

recommendation

RECOMMENDED ACTION:

Accept Improvements Under Contract for Century DeBenedetti Storm Drain Outfall.

 

body

BACKGROUND INFORMATION:

As previously discussed with the City Council, there are a number of locations around town that were heavily impacted by the recent, historic rainfall events. Over the coming years, staff plans to complete a variety of storm-related projects intended to reduce the impacts of future major storms. One of the areas most impacted is the area immediately adjacent to DeBenedetti Park (G-Basin), located at the southeast corner of Century Boulevard and Lower Sacramento Road.

 

This project constructed an additional storm drain outfall line into DeBenedetti Park from Century Boulevard at the northeast corner of the existing basin (see attached Exhibit A). This additional outfall will reduce the pressure on the main lines coming into the DeBenedetti Park basin, which will reduce the likelihood of street flooding for all of the developments in its drainage area. Photos of the new outfall are attached as Exhibit B.

 

Council approved the plans, specification, advertisement, and the award authority on June 21, 2023. Bids were received on July 19, 2023, with R. Sutton Enterprises being the lowest bidder (see breakdown below). The contractor started work on October 16, 2023, and completed the work on November 27, 2023. The contract was completed in substantial conformance with the specifications approved by City Council. The final contract price was $182,245.00, which is $5,149.00 less than the original contract price due to a credit given for the grass repair / installation. That work will be done in the spring (by Parks Department staff) for a better chance of successful planting.

                                                                                                                                                                                                                  Above/(Below)

Bidder                                                                Location                                           Bid Engineer’s                      Estimate

Engineer’s Estimate                                                                                                          $240,000.00

R Sutton Enterprises                                           Vallecito                                           $187,245.00                                           ($52,755.00)

ARB, Inc.                                                                Pittsburg                                           $231,321.00                                           ($ 8,769.00)

Design-Build, Inc.                                           Sacramento                                           $235,786.00                                           ($ 4,214.00)

Frontline Gen. Eng. Const.                      San Lorenzo                                           $239,000.00                                           ($ 1,000.00)

A.M. Stephens Const. Co                      Lodi                                                                $255,125.00                                           $15,125.00

Paulson Cox Const., Inc.                      Concord                                           $271,807.00                                           $31,807.00

 

Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder’s office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30-day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute.

 

STRATEGIC VISION:

5D. Infrastructure: Ensure capacity for future growth.

 

FISCAL IMPACT:

This project will reduce local street flooding and staff response needed for this area during major storm events. This project did not impact the General Fund.

 

FUNDING AVAILABLE:

This project was funded by Wastewater Capital (53199000.77020)

 

 

                                          _______________________________________

                                                            Charles E. Swimley

                                                            Public Works Director

 

                                                           

                                          _______________________________________

                                                            Andrew C. Keys

                                                            Interim City Manager