AGENDA TITLE:
title
Accept Improvements Under Contract for Lodi Indoor Gun Range Remodel Project (PW)
end
MEETING DATE:
June 18, 2025
PREPARED BY:
Public Works Director
recommendation
RECOMMENDED ACTION:
Accept improvements under contract for Lodi Indoor Gun Range Remodel Project.
body
BACKGROUND INFORMATION:
During the replacement of the heating, ventilation, and air conditional (HVAC) system at the Police Department's indoor range, it was discovered that the range had high levels of lead, which required a major lead abatement effort. That effort was done as a change order to the HVAC Replacement Project, and included removal of all of the existing gun range equipment. With all of the lead abatement completed and the interior completely cleared out, the City contracted with WMB Architects, of Stockton to design the necessary remodel. The design included installation of indoor gun range equipment, bullet-proof partition walls, an acoustical system, casework, and other miscellaneous and related items of work.
The City Council approved the plans and specifications, and authorized the advertisement for bids on September 26, 2023. Council also authorized the City Manager to award the contract to the lowest responsive bidder (not-to-exceed $900,000), as well as executing Change Orders (not-to-exceed $100,000).
On January 24, 2024, the City received seven responsive bids, as follows:
Bidder Location Base Bid Bid Alternates*
Diede Construction, Inc. Lodi $ 765,424.00 $ 63,050.00
Torres Project Management (TPM) Dixon $ 799,000.00 $ 41,200.00
Haggerty Construction Stockton $ 824,023.13 $ 47,245.07
Rodan Builders, Inc. Hayward $ 966,100.00 $ 85,000.00
JPB Designs, Inc. Orangevale $1,034,600.00 $ 190,000.00
American River Construction Placerville $1,070,000.38 $ 174,800.00
Pro-Ex Construction Rancho Cordova $1,228,840.00 $ 128,000.00
* None of the three Bid Alternates were awarded
The contractor started ...